Construction site madness: traffic jams in North Rhine-Westphalia from October 13th to 17th, 2025!

Transparenz: Redaktionell erstellt und geprüft.
Veröffentlicht am

Traffic restrictions in Junkersdorf due to construction sites on the A1 and A4 from October 13th to 17th, 2025 expect traffic jams.

Verkehrseinschränkungen in Junkersdorf aufgrund von Baustellen auf der A1 und A4 vom 13. bis 17. Oktober 2025 erwarten Staus.
Traffic restrictions in Junkersdorf due to construction sites on the A1 and A4 from October 13th to 17th, 2025 expect traffic jams.

Construction site madness: traffic jams in North Rhine-Westphalia from October 13th to 17th, 2025!

Significant traffic restrictions can be expected in North Rhine-Westphalia from today, October 13, 2025. The reason for this is construction sites on the A1 and A4 motorways, which will last until October 17, 2025. The restrictions apply in particular between 9:00 a.m. and 12:00 p.m., and in some cases until 1:00 p.m. From now on, everyone traveling in the region must be prepared for increased traffic volumes and possible traffic jams. Loud news.de The affected areas are diverse and should definitely be taken into account.

The construction sites on the A1 include the following sections:

  • A1, AD Erfttal (107) – AS Hürth (106), Länge: 0,15 km, maximale Durchfahrtsbreite: 3,75 m
  • A1, Ville – AS Gleuel (105), Länge: 0,15 km, maximale Durchfahrtsbreite: 3,75 m
  • A1, AS Gleuel (105) – AS Frechen (104), Länge: 0,15 km, maximale Durchfahrtsbreite: 3,75 m
  • A1, AS Gleuel (105) – AS Frechen (104) (einseitig), Länge: 0,15 km, maximale Durchfahrtsbreite: 3,75 m
  • A1, Ville – AS Frechen (104) (einseitig), Länge: 7,34 km, maximale Durchfahrtsbreite: 3,75 m

A look at the A4

Drivers also have to expect restrictions on the A4. Here are the construction sites:

  • A4, AK Kerpen (8) – Frechen, Länge: 0,15 km, maximale Durchfahrtsbreite: 7,50 m
  • A4, Frechen – AS Frechen-Nord (9b), Länge: 0,15 km, maximale Durchfahrtsbreite: 7,50 m
  • A4, Frechen – AK Köln-Süd (12), Länge: 10,13 km, maximale Durchfahrtsbreite: 7,50 m
  • A4, AS Frechen-Nord (9b) – AK Kerpen (8), Länge: 5,05 km, maximale Durchfahrtsbreite: 7,50 m
  • A4, AS Köln-Klettenberg (11a) – AS Köln-Eifeltor (11b) (einseitig), Länge: 0,77 km, maximale Durchfahrtsbreite: 3,25 m

This construction work will result in a further increase in the risk of traffic jams on these routes. As is often the case in the region, patience is required as other construction sites on the A1 are also causing additional problems. Loud verkehrslage.de Among other things, there will be bridge work between Dortmund and Cologne until the end of 2026, which will continue to lead to narrowings on the road.

Background information on traffic conditions

Why there are so many construction sites on the A1 and A4 can be understood from the concise figures that the Federal Ministry of Transport and Digital Infrastructure regularly publishes. In the latest edition of “Traffic in numbers” It becomes clear how important investments in infrastructure are. These include not only construction sites, but also annually updated data on traffic volumes and accidents and are essential for planning and improving mobility.

Use the coming days to plan your trips and take traffic forecasts into account to avoid unnecessary waiting times. Have a safe trip and stay calm!